Structural design of a footbridge: Difference between revisions
No edit summary |
No edit summary |
||
| Line 25: | Line 25: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| | |Drawings: | ||
General arrangement 1 | |||
General arrangement 2 | |||
|- | |- | ||
|Specifications | |Specifications | ||
Revision as of 23:44, 26 November 2021
This case study of the structural design of a footbridge provides documents that demonstrate how a stuctural design evolves.
The documents do not refer to a real site but they are based on a bridge that was built.
Definitions of document types: see here
Documents at stages 1 and 2
| Client brief |
| Site Information |
| Structural design brief - Stage 1 |
| Options analysis |
| Construction Methods |
| Structural design brief - Stage 2 |
| Design proposal stage - 2 |
Documents at stage 3 and 4
| Drawings:
General arrangement 1 General arrangement 2 |
| Specifications |
| Design verification
Preliminary techical assessment report A typical caculations pack (not for a bridge) |
Guidance for the design of footbridges
| CD353 Guidance for the design of footbridges. |
