Control of risk is a pervasive issue in engineered processes.  All the Engineer-it strategies are focused on minimisig the risk of unsatisfactor outcomes.
Control of risk is a pervasive issue in engineered processes.  All Engineer-it strategies contibute to minimisig the risk of unsatisfactory outcomes.
 
A common defininition of risk is: the combination of the likelihood of occurrence and the consequences of a hazard (i.e. a negative event i.e. a hazard.
 
A process for controlling risk is:
 
First, identify the hazard; then in order of preference:
 
# Take action to eliminate it
# Seek to reduce the likelihood of the event
# Seek to reduce the consequences should the event occur.
 
 
 
 
What if analys people say o ideay what mi - the hazard. The hazard might be eliminated by having only robots working on the scaffold. <br> To reduce the likelihood a waist high barrier can be provided <br> To reduce the consequences of a fall the operators may be attached by a safety rope.on hteht go wrong in a system
 
Formal approaches to risk control inclued
 
Use of a [[wikipedia:Risk_register|risk register]] where the hazards are identified, quantified and mitigated
 
Hazard and operability analysis ([[wikipedia:Hazard_and_operability_study|HAZOP]])  - typically used for the design and operation of chemical plant
 
 
Safety culture

Revision as of 22:00, 13 March 2021

Control of risk is a pervasive issue in engineered processes. All Engineer-it strategies contibute to minimisig the risk of unsatisfactory outcomes.

A common defininition of risk is: the combination of the likelihood of occurrence and the consequences of a hazard (i.e. a negative event i.e. a hazard.

A process for controlling risk is:

First, identify the hazard; then in order of preference:

  1. Take action to eliminate it
  2. Seek to reduce the likelihood of the event
  3. Seek to reduce the consequences should the event occur.



What if analys people say o ideay what mi - the hazard. The hazard might be eliminated by having only robots working on the scaffold.
To reduce the likelihood a waist high barrier can be provided
To reduce the consequences of a fall the operators may be attached by a safety rope.on hteht go wrong in a system

Formal approaches to risk control inclued

Use of a risk register where the hazards are identified, quantified and mitigated

Hazard and operability analysis (HAZOP) - typically used for the design and operation of chemical plant


Safety culture