The framework is a collection of ideas/information that may be used by learners of structural engneering design
The framework is a collection of ideas/information that may be used in structural engineering design


Features of the framework include ethos, examples, guidance and processes.
Features of the framework include ethos, examples, guidance and processes.


There is strong focus on the  use of a structural design brief that is a comprehensive list of requirements. Identifying all requirements and ensuring that they are satisfactorily addressed are key actions in reducing the risk of unsatisfactory outcomes.   
There is a focus on the  use of a [[Framework for structural design learning#Structural design brief|structural design brief]]. See also [[Top-down strategy#Requirements|here]]. Identifying all requirements and ensuring that they are properly addressed are key actions in reducing the risk of unsatisfactory outcomes.   


=== Ethos ===
=== Ethos ===
Ethos is about how you think, the principles that guide your actions. It is about being a [[Critical thinking|critical thinker]]. Structural design is a very good context for developing skil in critical thinking. Critical thinkers submit to a discipline for establishing outcomes that best satisfy the goals. For ideas about learning to be a critical thinker see [https://engineers.scot/office/resources/publications/discipline-ct.pdf this paper].
Ethos is about how you think, about the principles that guide your actions, about being a [[Critical thinking|critical thinker]],  Critical thinkers use the strategies described in [[Chapter 1:Strategies for engineered outcomes|Chapter 1]]. They submit to a discipline for establishing outcomes that best satisfy the goals. For ideas about learning to be a critical thinker see [https://engineers.scot/office/resources/publications/discipline-ct.pdf this paper].


=== Examples ===
=== Examples ===
It is very useful for learners to have available examples of typical outcomes.
It is very useful for learners to have available examples of typical outcomes - see [[Structural design of a footbridge|Footbridge]] example..
 
The [[Structural design of a footbridge|Footbridge]] and Industrial Building examples are provided for this purpose.


=== Guidance ===
=== Guidance ===
Line 18: Line 16:


=== Processes ===
=== Processes ===
Working with processes and seeking to improve them is a core issue in good design.
Working with processes and seeking to improve them is a core issue in good design. Analys for  validation (is the process appropriate?) and for verification (has the process been correctly implemented?) need to be regularly carred out.


==== The Structural Design Process ====
==== The Structural Design Process ====
Line 24: Line 22:


==== Process mapping ====
==== Process mapping ====
The Institution of Structural Egineers publises a [https://www.istructe.org/sitefiles/handlers/DownloadFile.ashx?productId=9746 Structural Plan of Work] that sets out an overall process for structural engineers working on a project for a building. It is based on the Royal Institute of British Architects [https://www.architecture.com/-/media/GatherContent/Test-resources-page/Additional-Documents/2020RIBAPlanofWorktemplatepdf.pdf (RIBA) Plan of Work]
The Institution of Structural Egineers publishes a [https://www.istructe.org/sitefiles/handlers/DownloadFile.ashx?productId=9746 Structural Plan of Work] that sets out an overall process for structural engineers working on the design of a building. It is based on the Royal Institute of British Architects [https://www.architecture.com/-/media/GatherContent/Test-resources-page/Additional-Documents/2020RIBAPlanofWorktemplatepdf.pdf (RIBA) Plan of Work]


The stages in the IStructE Plan of Work are shown in Figure 1.
The stages in the IStructE Plan of Work are shown in Figure 1.
[[File:ISE-PlanofW-2.png|thumb|972x972px|Figure 1 IStructE Structural Plan of Work|none]]That seems to be  a lot of stages but  'Re-use' and 'Decommissioning stages could be added to the list.
[[File:ISE-PlanofW-2.png|thumb|850x850px|Figure 1 IStructE Structural Plan of Work|none]]A simpler form of the Plan of Work for design is shown in Table 1..
 
[[File:Des-proc-2.png|center|thumb|800x800px|Table 1 Simplified process map for a structural design]]
For student project work, a simpler form of the Plan of Work might be used - such as shown in Figure 2.
==== Design Programme ====
[[File:Process-map.png|none|thumb|700x700px|Figure 2  Simplified process map for structural design]]
In any complex operation, it is important to work to a [[System Planning#Project Programme|project programme]]  
 
==== Design Plan ====
In any complex operation, it is important to work to a [[Planning|plan]].


==== The modelling process ====
==== The modelling process ====
Line 42: Line 37:


=== Design Documents ===
=== Design Documents ===
Key output documents are shown in Table 1
Key output documents are shown in Table 2
{| class="wikitable"
{| class="wikitable"
|+Table Stage activities and outcomes
|+Table Stage activities and outcomes
|'''Stage'''
|'''Stage'''
|
|'''Activities'''  
|'''Activities'''  
|'''Design documents'''
|'''Design documents'''
|-
|-
|0
|0
|Strategic definition
|Receive client brief and initial site information.
|Receive client brief and initial site information.
|1.       Client requirements
|Client requirements
|-
|-
|1
|1
|Preparation and briefing
|Develop the Structural Design Brief.
|Develop the Structural Design Brief.


Develop the Site Information Document.
Develop the Site Information Document.
|2.      Structural Design Brief (Stage 1)
|Structural Design Brief - stage 1


3.      Site information document
Site information document
|-
|-
|2
|2
|Concept design
|Carry out an options analysis.
|Carry out an options analysis.


Line 67: Line 66:


Develop a partial design for the structure.
Develop a partial design for the structure.
|4.      Structural Design Brief (Stage 2)
|Structural Design Brief - stage 2


5.      Options Analysis Report
Options Analysis Report


6.      Design Proposal for Stage 4
Design Proposal - stage 2
|-
|4  
|Technical design
|Ensure that all requirements have been adequately adddressed.
|Design verification
|-
|-
|4
|4.5
|Develop the complete structural design
|Production information
|7.      Production information: drawings and specifications
|Prepare drawings
 
|Drawings and specifications
8.      Design verification report
|}
|}


Line 87: Line 90:


==== '''Structural design brief''' ====
==== '''Structural design brief''' ====
This is a collection of all requirements that may affect the structural design including information about the processes to be used. If working with the RIBA Paln of Work, it can be viewed as a sub-section of the Project Brief.
This is a collection of all requirements that may affect the structural design including information about the processes to be used.  


The brief is established at Stage 1. At this stage it should, if practical, not relate to a specific structural form.
The brief is established at the Inception Stage. At this stage it should, if practical, not relate to a specific structural form.


The brief is developed at Stage 2 based on information from the options analysis..
The brief is developed at te Concept Stage based on information from the options analysis.


Changes to the brief should be avoided, if practical, after Stage 2.
Changes to the brief should be avoided, if practical, after the Concept Sstage


[https://www.designingbuildings.co.uk/wiki/Project_brief_for_design_and_construction This guidance] about the project brief in the RIBA plan of work states that: "The project brief is likely to be presented as a report, however, where possible, information and requirements should be scheduled in a database or spreadsheet format that will be easy to expand and will be easy to use to test whether proposals satisfy requirements later in the project."  Such a schedule can be viewed as a design process map or an extended plan of work. Use of a schedule of this type for the structural design is reoommended.
[https://www.designingbuildings.co.uk/wiki/Project_brief_for_design_and_construction This guidance] about the project brief in the RIBA plan of work states that: "The project brief is likely to be presented as a report, however, where possible, information and requirements should be scheduled in a database or spreadsheet format that will be easy to expand and will be easy to use to test whether proposals satisfy requirements later in the project."  Such a schedule can be viewed as a design process map or an extended plan of work. Use of a schedule of this type for the structural design is reoommended.


==== '''Options analysis Report''' ====
'''Recommended Verbal forms to be used in the brief'''   (from [https://www.standardsforhighways.co.uk/prod/attachments/7b057727-55ee-48e5-98ff-bc3084ef807c?inline=true GG 101]-page 4)
A report on how a set of options was developed to a degree of detail sufficient to assess them against the requirements leading to a decision on the form of structure to be used.  
 
• The verb ’must’ indicates a statutory or legislative requirement.
 
• The verb ’shall’ indicates a requirement of the Overseeing Organisation.


==== '''Design Proposal for Stage 4''' ====
• The verb ’should’ indicates advice expressed as a recommendation.
This document is similar to the ''[https://www.standardsforhighways.co.uk/prod/attachments/17dadcc6-8e01-455d-b93e-c827d280839a?inline=true Approval in Principle]'' document for bridges and to the ''Basis of Structural Design'' document described for the IStructE Plan of Work.


It is recommended that the Design Proposal for Stage 4 includes:
• The verb ’may’ indicates advice expressed as a permissible approach.


1.  Project description
• The verb ’can’ or verbs expressed in the present tense other than ’must’, ’shall’, ’should’ and ’may’ are used to introduce notes, which provide a short clarification of a concept or statement of fact.


2.  Reference to documents:
==== '''Options analysis Report''' ====
This reports describes an assessment of options for the structure against the requiremets and proposes a form of structure to be adopted.  


        Client brief
==== '''Design Proposal - stage 2''' ====
This document is similar to the ''[https://www.standardsforhighways.co.uk/prod/attachments/17dadcc6-8e01-455d-b93e-c827d280839a?inline=true Approval in Principle]'' document for bridges and to the ''Basis of Structural Design'' document recommended in the IStructE Plan of Work.


        Site Information
It is recommended that the Design Proposal - stage 2 includes:


        Structural Design Brief (Stage 2)
1.  Project description


        Options Analysis Report
2.  Reference to documents:


3.  Information about the proposed structure - what has been decided at the end of Stage 2 mainly as a result of the options analysis.
* Design Brief - Stage 2
* Site Information
* Options Analysis Report
* Structural Design Brief (Stage 2)


4. Statements in relation to the design brief items in terms of:
3.  Information about the proposed structure - what has been decided at the end of the Concept Stage.


        What has been addressed at the end of Stage 2.
4. Statements in relation to:


        Actions needed at Stage 4 to ensure that all requirements have been properly addressed.
* The requirements that have been addressed at the end of Stage 2.       
* Actions/processes needed at the Production Stage to ensure that all requirements will be properly addressed.
* Issues to be addressed that are not included in codes of practice.


==== '''Design verification report''' ====
==== '''Design verification report''' ====
Line 146: Line 158:
      Record of verification processes
      Record of verification processes


3. Stability and Robustness report.
3. Stability and Robustness report.


4.  Sustainability Report
4.  Sustainability Report
Line 154: Line 166:
6.  Cost analysis
6.  Cost analysis


7.  Construction methods
7.  Construction Methods statement
 
       Statement
 
       CDM report

Latest revision as of 14:09, 18 November 2021

The framework is a collection of ideas/information that may be used in structural engineering design

Features of the framework include ethos, examples, guidance and processes.

There is a focus on the use of a structural design brief. See also here. Identifying all requirements and ensuring that they are properly addressed are key actions in reducing the risk of unsatisfactory outcomes. 

Ethos

Ethos is about how you think, about the principles that guide your actions, about being a critical thinker, Critical thinkers use the strategies described in Chapter 1. They submit to a discipline for establishing outcomes that best satisfy the goals. For ideas about learning to be a critical thinker see this paper.

Examples

It is very useful for learners to have available examples of typical outcomes - see Footbridge example..

Guidance

See here.

Processes

Working with processes and seeking to improve them is a core issue in good design. Analys for validation (is the process appropriate?) and for verification (has the process been correctly implemented?) need to be regularly carred out.

The Structural Design Process

See here.

Process mapping

The Institution of Structural Egineers publishes a Structural Plan of Work that sets out an overall process for structural engineers working on the design of a building. It is based on the Royal Institute of British Architects (RIBA) Plan of Work

The stages in the IStructE Plan of Work are shown in Figure 1.

Figure 1 IStructE Structural Plan of Work

A simpler form of the Plan of Work for design is shown in Table 1..

Table 1 Simplified process map for a structural design

Design Programme

In any complex operation, it is important to work to a project programme

The modelling process

See here.

Control strategies

See here

Design Documents

Key output documents are shown in Table 2

Table 2  Stage activities and outcomes
Stage Activities Design documents
0 Strategic definition Receive client brief and initial site information. Client requirements
1 Preparation and briefing Develop the Structural Design Brief.

Develop the Site Information Document.

Structural Design Brief - stage 1

Site information document

2 Concept design Carry out an options analysis.

Decide on the option to be used.

Develop a partial design for the structure.

Structural Design Brief - stage 2

Options Analysis Report

Design Proposal - stage 2

4 Technical design Ensure that all requirements have been adequately adddressed. Design verification
4.5 Production information Prepare drawings Drawings and specifications

Client requirements

The client requirements that relate to the structure.

Site information

This document may include information about:  topography, existing site features, former usage, services, ground conditions, etc.

Structural design brief

This is a collection of all requirements that may affect the structural design including information about the processes to be used.

The brief is established at the Inception Stage. At this stage it should, if practical, not relate to a specific structural form.

The brief is developed at te Concept Stage based on information from the options analysis.

Changes to the brief should be avoided, if practical, after the Concept Sstage

This guidance about the project brief in the RIBA plan of work states that: "The project brief is likely to be presented as a report, however, where possible, information and requirements should be scheduled in a database or spreadsheet format that will be easy to expand and will be easy to use to test whether proposals satisfy requirements later in the project." Such a schedule can be viewed as a design process map or an extended plan of work. Use of a schedule of this type for the structural design is reoommended.

Recommended Verbal forms to be used in the brief (from GG 101-page 4)

• The verb ’must’ indicates a statutory or legislative requirement.

• The verb ’shall’ indicates a requirement of the Overseeing Organisation.

• The verb ’should’ indicates advice expressed as a recommendation.

• The verb ’may’ indicates advice expressed as a permissible approach.

• The verb ’can’ or verbs expressed in the present tense other than ’must’, ’shall’, ’should’ and ’may’ are used to introduce notes, which provide a short clarification of a concept or statement of fact.

Options analysis Report

This reports describes an assessment of options for the structure against the requiremets and proposes a form of structure to be adopted.

Design Proposal - stage 2

This document is similar to the Approval in Principle document for bridges and to the Basis of Structural Design document recommended in the IStructE Plan of Work.

It is recommended that the Design Proposal - stage 2 includes:

1.  Project description

2.  Reference to documents:

  • Design Brief - Stage 2
  • Site Information
  • Options Analysis Report
  • Structural Design Brief (Stage 2)

3.  Information about the proposed structure - what has been decided at the end of the Concept Stage.

4. Statements in relation to:

  • The requirements that have been addressed at the end of Stage 2.     
  • Actions/processes needed at the Production Stage to ensure that all requirements will be properly addressed.
  • Issues to be addressed that are not included in codes of practice.

Design verification report

This report demonstrates that the mandatory requirements have been satisfied and how the non-mandatory requirements have been addressed.

It records validation of the processes used and how the processes were verified.

It serves as a record of what has been done for archiving purposes.

Typical contents of a verification report:

1. Modelling

     Description of the models used.

     Modelling reviews: model validation, results verification

2.  Code of practice calculations.

      Record of calculations

      Record of verification processes

3. Stability and Robustness report.

4.  Sustainability Report

5.  Access and Maintenance strategy

6.  Cost analysis

7.  Construction Methods statement