1,351
edits
No edit summary |
No edit summary |
||
Line 21: | Line 21: | ||
A main feature of an engineered process is that it is adapted to the context and kept under constant review. | A main feature of an engineered process is that it is adapted to the context and kept under constant review. | ||
System planning for structural design is discussed [[Structural design processes|here]]. The need for system planning for | System planning for structural design is discussed [[Structural design processes|here]]. The need for system planning for the electricity system is discussed [[Energy planning#System planning|here]]. | ||
System planning is needed for: | System planning is needed for: |