Jump to content

Energy planning: Difference between revisions

19 bytes added ,  12:08, 7 November 2021
no edit summary
No edit summary
No edit summary
Line 102: Line 102:
Pre-1990 the UK Electricity Boards (CEGB, SSEB and NSHEB) provided a reliable supply and worked successfully to keep costs down. They did forward planning that identified the optimum location and type of generation plant in relation to a range of issues such as system cost, fuel source proximity, operational flexibility, fuel supply security etc.
Pre-1990 the UK Electricity Boards (CEGB, SSEB and NSHEB) provided a reliable supply and worked successfully to keep costs down. They did forward planning that identified the optimum location and type of generation plant in relation to a range of issues such as system cost, fuel source proximity, operational flexibility, fuel supply security etc.


=== IES papers ===


==== IES opinion pieces on energy issues: ====
==== IES opinion pieces on energy issues: ====