Jump to content

Structural design processes: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 92: Line 92:
* Ensure that all requirements have been identified and adequately stated in the Structural Design Brief
* Ensure that all requirements have been identified and adequately stated in the Structural Design Brief


'''Recommended verbal forms to be used in the brief''' (from GG 101-page 4)
'''Recommended verbal forms to be used in the brief''' (from [https://www.standardsforhighways.co.uk/prod/attachments/7b057727-55ee-48e5-98ff-bc3084ef807c?inline=true GG 101]-page 4)


* The verb ’must’ indicates a statutory or legislative requirement.
* The verb ’must’ indicates a statutory or legislative requirement.